Прегледај по Аутор "Subotić, Marko"
Сада се приказује 1 - 15 од 15
Резултати по страници
Опције сортирања
- СтавкаA New Fuzzy MARCOS Method for Road Tra c Risk Analysis(MDPI, 2020) Stanković, Miomir; Stević, Željko; Kumar Das, Dillip; Subotić, Marko; Pamučar, DraganIn this paper, a new fuzzy multi-criteria decision-making model for tra c risk assessment was developed. A part of a main road network of 7.4 km with a total of 38 Sections was analyzed with the aim of determining the degree of risk on them. For that purpose, a fuzzy Measurement Alternatives and Ranking according to the COmpromise Solution (fuzzy MARCOS) method was developed. In addition, a new fuzzy linguistic scale quantified into triangular fuzzy numbers (TFNs) was developed. The fuzzy PIvot Pairwise RElative Criteria Importance Assessment—fuzzy PIPRECIA method—was used to determine the criteria weights on the basis of which the road network sections were evaluated. The results clearly show that there is a dominant section with the highest risk for all road participants, which requires corrective actions. In order to validate the results, a comprehensive validity test was created consisting of variations in the significance of model input parameters, testing the influence of dynamic factors—of reverse rank, and applying the fuzzy Simple Additive Weighing (fuzzy SAW) method and the fuzzy Technique for Order of Preference by Similarity to Ideal Solution (fuzzy TOPSIS). The validation test show the stability of the results obtained and the justification for the development of the proposed model.
- СтавкаA Novel CRITIC-Fuzzy FUCOM-DEA-Fuzzy MARCOS Model for Safety Evaluation of Road Sections Based on Geometric Parameters of Road(MDPI, 2020) Mitrović Simić, Jelena; Stević, Željko; Kazimieras Zavadskas, Edmundas; Bogdanović, Vuk; Subotić, Marko; Mardani, AbbasTrends of globalization very often cause the emergence of phenomena that asymmetrically affect the overall sustainability of the transport system. In order to predict certain situations and potentially be able to manage the transport system, it is necessary to manage risk situations and trffc safety in a timely manner. This study has conducted an investigation which implies defining the level of safety of a total of nine sections of two-lane roads. The main aim of the paper is to create a new multiphase model consisting of CRITIC (The CRiteria Importance Through Intercriteria Correlation), Fuzzy FUCOM (Full Consistency Method), DEA (Data Envelopment Analysis), and Fuzzy MARCOS (Measurement Alternatives and Ranking according to the COmpromise Solution) methods for determining the level of traffc safety on road sections under the conditions of uncertainty. In order for the created model to be adequately applied, eight parameters were created, and they were classified through four inputs and four outputs. To calculate the significance of the inputs, the CRITIC method based on the symmetric correlation matrix was used, and taking into account the nature of the outputs, the Fuzzy FUCOM method based on averaged values using the fuzzy Bonferroni Mean (BM) operator was applied to determine their weights. To determine the degree of safety, the DEA model was created. After that, the Fuzzy MARCOS method was used in order to determine the final ranking of the remaining five sections of the road network. Finally, the verification of results was performed through three phases of Sensitivity Analysis (SA).
- СтавкаA Novel Data-Envelopment Analysis Interval-Valued Fuzzy-Rough-Number Multi-Criteria Decision-Making (DEA-IFRN MCDM) Model for Determining the Efficiency of Road Sections Based on Headway Analysis(MDPI, 2024) Andjelković, Dejan; Stojić, Gordan; Nikolić, Nikola; Kumar Das, Dillip; Subotić, Marko; Stević, ŽeljkoThe capacity of transport infrastructure is one of the very important tasks in transport engineering, which depends mostly on the geometric characteristics of road and headway analysis. In this paper, we have considered 14 road sections and determined their efficiency based on headway analysis. We have developed a novel interval fuzzy-rough-number decision-making model consisting of DEA (data envelopment analysis), IFRN SWARA (interval-valued fuzzy-rough-number stepwise weight-assessment-ratio analysis), and IFRNWASPAS (interval-valued fuzzy-rough-number weighted-aggregate sum–product assessment) methods. The main contribution of this study is a new extension of WASPAS method with interval fuzzy rough numbers. Firstly, the DEA model was applied to determine the efficiency of 14 road sections according to seven input–output parameters. Seven out of the fourteen alternatives showed full efficiency and were implemented further in the model. After that, the IFRN SWARA method was used for the calculation of the final weights, while IFRNWASPAS was applied for ranking seven of the road sections. The results show that two sections are very similar and have almost equal efficiency, while the other results are very stable. According to the results obtained, the best-ranked is a measuring segment of the Ivanjska–Šargovac section, with a road gradient = 5.5%, which has low deviating values of headways according to the measurement classes from PC-PC to AT-PC, which shows balanced and continuous traffic flow. Finally, verification tests such as changing the criteria weights, comparative analysis, changing the parameter, and reverse rank analysis have been performed.
- СтавкаA Novel Hybrid Fuzzy Multiple-Criteria Decision-Making Model for the Selection of the Most Suitable Land Reclamation Variant at Open-Pit Coal Mines(MDPI, 2024) Dimitrijević, Bojan; Šubaranović, Tomislav; Stević, Željko; Kchaou, Mohamed; Alqurashi, Faris; Subotić, MarkoThe expansion of the open-pit exploitation of mineral raw materials, and especially the energy resources of fossil fuels, makes open-pit coal mines spatially dominant objects of large mining basins. Exploitation activities are accompanied by negative ecological impacts on the environment, which requires the integral planning, revitalization, reclamation, and rehabilitation of the disturbed area for human use in the post-exploitation period. The post-exploitation remediation and rehabilitation of open-pit mining areas and disposal sites, i.e., space disturbed by mining activities and accompanying facilities, are complex synthetic multidisciplinary multiphase engineering project tasks. In this paper, a hybrid fuzzy MCDM model (Multiple-Criteria Decision-Making) was developed for the selection of a reclamation solution for the Tamnava-West Field open-pit mine. IMF SWARA (Improved Fuzzy Stepwise Weight Assessment Ratio Analysis) was applied to define the weights of 12 criteria of different structures used in the evaluation of reclamation solutions. The Fuzzy ROV (Range of Value) method was applied to select the reclamation solution from a total of 11 solutions previously obtained using a process approach. The results of the hybrid IMF SWARA—Fuzzy ROV model show that forestry is the best solution for the Tamnava-West Field open-pit mine. After the results had been obtained, verification analyses of the proposed model were performed and the best stable proposed reclamation solution was determined.
- СтавкаA novel interval rough model for optimizing road network performance and safety(ELSEVIER, 2024) Na, Zhou; Stević, Željko; Subotić, Marko; Kumar Das, Dillip; Kou, Gang; Moslem, SarbastThis paper introduces a novel Integrated Interval Rough Pivot Pairwise Relative Criteria Importance Assessment (IRN PIPRECIA) model combined with Interval Rough Combined Compromise Solution (IRN CoCoSo), marking a significant advancement in sustainable traffic flow management for commercial vehicles. This innovative merger is a first in literature, methodologically enhancing the evaluation of road sections based on critical parameters including passenger car equivalent (PCE) 85%, AADT, road conditions, and accident data. Our model systematically fills the research gap in holistic traffic performance analysis, providing a unique tool for prioritizing road safety and efficiency. The key scientific contribution is the model’s ability to integrate causal and consequential traffic factors into a single framework, offering a novel multi-criteria decision-making (MCDM) approach. Results, validated through various verification models, show the integrated model’s effectiveness in real-world scenarios, confirming its robustness and stability. With strong engineering application potential, our work supports urban planners and traffic managers in making informed, sustainable decisions. The model extends beyond traditional traffic analysis, promising a shift towards more adaptive, data-driven infrastructure management. Future research will aim to refine the criteria basis and explore real-time decision-making through advanced MCDM applications.
- СтавкаAssessment of Causes of Delays in the Road Construction Projects in the Benin Republic Using Fuzzy PIPRECIA Method(Hindawi, 2022) Stević, Željko; Bayane Bouraima, Mouhamed; Subotić, Marko; Qiu, Yanjun; Antwi Buah, Peter; Maraka Ndiema, Kevin; Magloire Ndjegwes, ChristianPurpose. The purpose of this study is to examine the causes of delays in road construction projects in the Benin Republic from the consultant, client, and contractor perspectives. Design/Methodology/Approach. Through construction project reports, 20 factors that could cause delays in road construction projects were identified. The factors were arranged into a questionnaire, which was distributed to three separate experts. The fuzzy PIPRECIA (PIvot Pairwise RElative Criteria Relevance Assessment) method was used to calculate the independent importance of each delay factor. The Spearman and Pearson correlation coefficients were used to test the method’s consistency. Findings. The top five road construction project delays in the Benin Republic, according to the analysis of the 20 factors considered, are project funding, slowness during the client-endorsed payment process, scarcity of professional personnel, delay in indemnifying reimbursement (land-owners), and price escalation. This shows that of the various types of delays, the financial delay group is the most crucial. Originality/value. This study evaluates the causes of delays in road construction projects in the Benin Republic for the first time in literature. This study also examined the top 5 delay factors in road construction projects. This study is based on reports from road construction projects and a performed questionnaire survey. Based on the findings, measures have been formulated to aid project managers to alleviate the road construction delays in the Benin Republic. In addition, this study is practical for both scholars and road construction parties and provides a complete and verifiable analysis of the progress of a road construction project to make it easier and attain a competitive level of time, cost, and quality for successful road construction.
- СтавкаDevelopment of a New Risk Assessment Methodology for Light Goods Vehicles on Two-Lane Road Sections(MDPI, 2021) Subotić, Marko; Radičević, Veljko; Pavlović, Zoran; Ćirović, GoranIncreasing mobility directly affects traffic frequency and thus increases the possible risk of traffic accident occurrences. Taking this into account, it is necessary to create models for determining risk and to act preventively based on these models; this is of great importance both to society and science. In this paper, six measuring sections of a road network are considered on the basis of eight geometric-exploitation road parameters, taking into account the data for light goods vehicles. An original methodology is proposed for identifying risk levels of road sections through their evaluation. For identifying risk levels, the Dombi Logarithmic Methodology of Additive Weights (D’LMAW) was used, which was combined with the Measurement Alternatives and Ranking according to the Compromise Solution (MARCOS) method. Statistical indicators were processed using a hybrid methodology based on the application of rough numbers and Dombi–Bonferroni functions. The performance of the presented methodology was verified on a real-world example, processing the statistical parameters of six two-lane road sections, with the sixth measuring section showing the best performance, since it had the minimum risk. Research has shown that measuring sections with increasing longitudinal gradients are safer. The analysis of measuring sections from fall to rise reduces the deviation of speeds from the speed limit on the roads. The effectiveness, rationality, and robustness of the solution of the proposed methodology was confirmed through a sensitivity analysis.
- СтавкаModels of Analysis of Credible Deviation from Speed Limits on Two-Lane Roads of Bosnia and Herzegovina(Wiley, 2022) Subotić, Marko; Stepanović, Nemanja; Tubić, Vladan; Softić, Edis; Bayane Bouraima, MouhamedAny deviation of speed in a traffic flow from a speed limit represents a potential risk of traffic accidents, so speed management appears as an imperative. However, an inadequately set speed limit often causes drivers’ noncompliance to it in the conditions of real traffic flow. By determining the value of exceeding the speed limit according to vehicle classes, it is possible to recommend a credible speeding value that can be considered credible up to a value above the speed limit. In this paper, deterministic multistep mathematical models of speed deviation from the speed limit as a function of longitudinal gradient for the proposed vehicle classes were developed. A total of 11 measuring sections with different traffic flow types were analyzed. Based on a detailed analysis of speeding, models for the deviation of the 15th, 50th, and 85th percentiles were obtained, with the aim of adjusting the credible deviation to control measures. -e results obtained in this study were compared with a survey of traffic flow speeding on two-lane roads conducted in Serbia.
- СтавкаOne Approach to Quantifying Rainfall Impact on the Traffic Flow of a Specific Freeway Segment(MDPI, 2022) Vidas, Marijo; Tubić, Vladan; Ivanović, Ivan; Subotić, MarkoSpatial constraints in urban areas very often lead to the application of traffic management measures to meet transport demands. Accordingly, it is very important to identify all potential impacts that could lead to reductions in the street network’s capacity. One such impact is weather conditions. The main motivation of this research is to analyze the impacts of rainfall on one of the most important segments of Belgrade’s street network that represents part of a freeway passing the city center. Our focus is on quantifying the impact of rainfall on speed and capacity. This paper proposes a new approach to analyzing the rainfall impact at the traffic lane level that provides additional possibilities to apply traffic management measures on the traffic lane level instead of at the direction level only. Functional dependences and differences in capacity and speed on traffic lanes were found under the influence of different rainfall intensities. Reductions in free-flow speed depend on the rain category and traffic lanes and vary from 4.5% to 11.58%, while reductions in traffic lane capacity range from 2.46% to 12.97%. We demonstrate the importance of considering the impact of rainfall at the traffic lane level, which could be quality input data for defining appropriate traffic management measures to mitigate the negative impacts.
- СтавкаRanking Road Sections Based on MCDM Model: New Improved Fuzzy SWARA (IMF SWARA)(MDPI, 2021) Vrtagić, Sabahudin; Softić, Edis; Subotić, Marko; Stević, Željko; Dordevic, Milan; Ponjavic, MirzaTraffic management is a significantly difficult and demanding task. It is necessary to know the main parameters of road networks in order to adequately meet traffic management requirements. Through this paper, an integrated fuzzy model for ranking road sections based on four inputs and four outputs was developed. The goal was to determine the safety degree of the observed road sections by the methodology developed. The greatest contribution of the paper is reflected in the development of the improved fuzzy step-wise weight assessment ratio analysis (IMF SWARA) method and integration with the fuzzy measurement alternatives and ranking according to the compromise solution (fuzzy MARCOS) method. First, the data envelopment analysis (DEA) model was applied, showing that three road sections have a high traffic risk. After that, IMF SWARA was applied to determine the values of the weight coefficients of the criteria, and the fuzzy MARCOS method was used for the final ranking of the sections. The obtained results were verified through a three-phase sensitivity analysis with an emphasis on forming 40 new scenarios in which input values were simulated. The stability of the model was proven in all phases of sensitivity analysis
- СтавкаSustainability of the Optimum Pavement Model of Reclaimed Asphalt from a Used Pavement Structure(MDPI, 2020) Softić, Edis; Radičević, Veljko; Subotić, Marko; Stević, Željko; Talić, Zlatan; Pamučar, DraganThis paper demonstrates and provides additional findings and instructions to produce new cold-recycled layers of pavement structures spatially and temporally sustainable. At the same time, recycled pavement structures have been enhanced with optimum amounts of new stone materials and binders made of cement and foamed bitumen. The subject of the research is based on the examination of recycled asphalt from surface and bituminous base courses of pavement structures for use on higher-type roads. The aim of the research is to model the process of producing recycled asphalt by cold recycling to optimize the process of influential parameters. In addition, one of the primary goals of the research is to demonstrate a sustainable way of producing new cold-recycled layers of pavement structures. The obtained results indicated the inevitability of the use of recycled material from pavement structures with the possibility of applying secondary and tertiary crushing of recycled mass, which depends on the type of layer for which the recycled material would be used. The research resulted in an optimum mixture variant of the stabilization layer of pavement structure that consists mainly of recycled material from a worn pavement structure improved with a relatively small amount of new aggregate with the addition of minimal stabilizers made of cement and foamed bitumen. The results showed that the optimum mixture variant of the stabilization layer is spatially and temporally stable. Additionally, the presented optimum variant of the stabilization layer enables sustainable development of road networks with minimum consumption of new natural resources.
- СтавкаThe Location Selection for Roundabout Construction Using Rough BWM-Rough WASPAS Approach Based on a New Rough Hamy Aggregator(MDPI, 2018) Stević, Željko; Pamučar, Dragan; Subotić, Marko; Antuchevičiene, Jurgita; Zavadskas, Edmundas KazimierasAn adequately functionally located traffic infrastructure is an important factor in the mobility of people because it affects the quality of traffic, safety and efficiency of carrying out transportation activities. Locating a roundabout on an urban network is an imperative for road engineering to address traffic problems such as reduction of traffic congestion, enhancement of security and sustainability, etc. Therefore, this paper evaluates potential locations for roundabout construction using Rough BWM (BestWorst Method) and RoughWASPAS (Weighted Aggregated Sum Product Assessment) models. Determination of relative criterion weights on the basis of which the potential locations were evaluated was carried out using the Rough BWM method. In this paper, in order to enable the most precise consensus for group decision making, a Rough Hamy aggregator has been developed. The main advantage of the Hamy mean (HM) operator is that it can capture the interrelationships among multi-input arguments and can provide DMs more options. Until now, there is no research based on HM operator for aggregating imprecise and uncertain information. The obtained indicators are described through eight alternatives. The results show that the fifth and sixth alternatives are the locations that should have a priority in the construction of roundabouts from the perspective of sustainable development, which is confirmed throughout changes of parameter k and with comparing to other methods in the sensitivity analysis.
- СтавкаTHE SELECTION OF A LOCATION FOR POTENTIAL ROUNDABOUT CONSTRUCTION – A CASE STUDY OF DOBOJ(2020) Subotić, Marko; Stević, Biljana; Ristić, Bojana; Simić, SanjaThe increase in the number of traffic accidents, as well as the development of modern traffic signaling, have influenced realistic traffic solutions at intersections to be aimed at constructing roundabouts, which has increased the capacity and safety of traffic participants. This paper has several goals that refer to the development of methodology for evaluating potential locations for roundabout construction. The subject of this research is based on the development of a model for the construction of a roundabout in Doboj using the integrated BWM (Best Worst Method) and MABAC (Multi-Attributive Border Approximation area Comparison) approach. Taking into account the fact that Doboj is a transport hub where many roads intersect and that it is a very important transit point, the necessity of constructing roundabouts is justified. Therefore, as part of the paper, an adequate methodology has been developed for an optimal selection of a potential location for the construction of a roundabout.
- СтавкаTrapezoidal Interval Type-2 Fuzzy PIPRECIA-MARCOS Model for Management Efficiency of Traffic Flow on Observed Road Sections(MDPI, 2023) Xu, Wei; Kumar Das, Dillip; Stević, Željko; Subotić, Marko; Alrasheedi, Adel F.; Sun, ShiruRoad infrastructure management is an extremely important task of traffic engineering. For the purpose of efficient management, it is necessary to determine the efficiency of the traffic flow through PAE 85%, AADT and other exploitation parameters on the one hand, and the number of different types of traffic accidents on the other. In this paper, a novel TrIT2F (trapezoidal interval type-2 fuzzy) PIPRECIA (pivot pairwise relative criteria importance assessment)-TrIT2F MARCOS (measurement of alternatives and ranking according to compromise solution) was developed in order to, in a defined set of 14 road segments, identify the most efficient one for data related to light goods vehicles. Through this the aims and contributions of the study can be manifested. The evaluation was carried out on the basis of seven criteria with weights obtained using the TrIT2F PIPRECIA, while the final results were presented through the TrIT2F MARCOS method. To average part of the input data, the Dombi and Bonferroni operators have been applied. The final results of the applied TrIT2F PIPRECIA-TrIT2F MARCOS model show the following ranking of road segments, according to which Vrhovi–Šešlije M-I-103 with a gradient of 1.00 represents the best solution: A5 > A8 > A2 > A1 > A4 > A3 > A6 > A12 > A13 = A14 > A11 > A7 > A9 > A10. In addition, the validation of the obtained results was conducted by changing the values of the four most important criteria and changing the size of the decision matrix. Tests have shown great stability of the developed TrIT2F PIPRECIA-TrIT2F MARCOS model.
- СтавкаVideo Data Extraction and Processing for Investigation of Vehicles’ Impact on the Asphalt Deformation Through the Prism of Computational Algorithms(2020) Vrtagić. Sabahudin; Softić, Edis; Ponjavić, Mirza; Stević, Željko; Subotić, Marko; Gmanjunath, Aditya; Kevric, JasminThere are numerous algorithms and solutions for car or object detection as humanity is aiming towards the smart city solutions. Most solutions are based on counting, speed detection, traffic accidents and vehicle classification. The mentioned solutions are mostly based on high-quality videos, wide angles camera view, vehicles in motion, and are optimized for good visibility conditions intervals. A novelty of the proposed algorithm and solution is more accurate digital data extraction from video file sources generated by security cameras in Bosnia and Herzegovina from M18 roadway, but not limited only to that particular source. From the video file sources, data regarding number of vehicles, speed, traveling direction, and time intervals for the region of interest will be collected. Since finding contours approach is effective only on objects that are mobile, and because the application of this approach on traffic junctions did not yield desired results, a more specific approach of classification using a combination of Histogram of Oriented Gradients (HOG) and Support Vector Machines (Linear SVM) has shown to be more appropriate as the original source data can be used for training where the main benefit is the preservation of local second-order interactions, providing tolerance to local geometric misalignment and ability to work with small data samples. The features of the objects within a frame are extracted first by standardizing the feature variables and then computing the first order gradients of the frame. In the next stage, an encoding that remains robust to small changes while being sensitive to local frame content is produced. Finally, the HOG descriptors are generated and normalized again. In this way the channel histogram and spatial vector becomes the feature vector for the Linear SVM classifier. With the following parameters and setup system accuracy was around 85 to 95%. In the next phase, after cleaning protocols on collected data parameters, data will be used to research asphalt deformation effects.