A Novel Integrated Interval Rough MCDM Model for Ranking and Selection of Asphalt Production Plants
dc.citation.spage | 260 | |
dc.citation.volume | 9 | |
dc.contributor.author | Matić, Bojan | |
dc.contributor.author | Jovanović, Stanislav | |
dc.contributor.author | Marinković, Milan | |
dc.contributor.author | Sremac, Siniša | |
dc.contributor.author | Kumar Das, Dillip | |
dc.contributor.author | Stević, Željko | |
dc.date.accessioned | 2023-06-08T10:07:05Z | |
dc.date.available | 2023-06-08T10:07:05Z | |
dc.date.issued | 2021 | |
dc.description.abstract | Asphalt production plants play an important role in the field of civil engineering, but also in the entire economic system since the construction of roads enables uninterrupted functioning within it. In this paper, the ranking of asphalt production plants on the territory of the Autonomous Province of Vojvodina has been performed. The modern economy needs contemporary models and methods to solve complicated MCDM problems and, for these purposes, it has been developed an original Interval Rough Number (IRN) Multi-criteria decision-making (MCDM) model that implies an extension of two methods belonging to the field with interval rough numbers. After forming a list of eight most significant criteria for assessing the efficiency of asphalt production plants, the Interval Rough Number PIvot Pairwise RElative Criteria Importance Assessment (IRN PIPRECIA) method was developed to determine the significance of the criteria. A total of 21 locations with asphalt mixture installation were considered. For that purpose, seven asphalt production plants were included, and for their ranking, the IRN EDAS (Evaluation based on Distance from Average Solution) method was created. The aim of this paper is to develop a novel interval rough model that can be useful for determining the efficiency of asphalt production plants. Averaging in group decision-making (GDM) for both methods was performed using an IRN Dombi weighted geometric averaging (IRNDWGA) aggregator. The obtained results show that (A15) Ruma (SP)–Mačvanska Mitrovica–Zasavica has the best characteristics out of the set of locations considered in this study. However, Alternatives A6 and A19 are also variants with remarkably good characteristics since there is very little difference in values compared to the first-ranked alternative. Also, the obtained results have shown that the developed model is applicable, which is proven through a comparative analysis | |
dc.identifier.doi | 10.3390/math9030269 | |
dc.identifier.uri | https://vaseljena.ues.rs.ba/handle/123456789/306 | |
dc.language.iso | en | |
dc.publisher | MDPI | |
dc.source | Mathematics | |
dc.subject | asphalt production plants; IRN PIPRECIA; IRN EDAS; road construction | |
dc.title | A Novel Integrated Interval Rough MCDM Model for Ranking and Selection of Asphalt Production Plants | |
dc.type | Article |
Датотеке
Оригинални завежљај
1 - 1 од 1
Учитавање...
- Име:
- A Novel Integrated Interval Rough MCDM Model for Ranking.pdf
- Величина:
- 1.42 MB
- Формат:
- Adobe Portable Document Format
- Опис:
Свежањ лиценце
1 - 1 од 1
Учитавање...
- Име:
- license.txt
- Величина:
- 1.71 KB
- Формат:
- Item-specific license agreed to upon submission
- Опис: