Прегледај по Аутор "Bayane Bouraima, Mouhamed"
Сада се приказује 1 - 2 од 2
Резултати по страници
Опције сортирања
- СтавкаAssessment of Causes of Delays in the Road Construction Projects in the Benin Republic Using Fuzzy PIPRECIA Method(Hindawi, 2022) Stević, Željko; Bayane Bouraima, Mouhamed; Subotić, Marko; Qiu, Yanjun; Antwi Buah, Peter; Maraka Ndiema, Kevin; Magloire Ndjegwes, ChristianPurpose. The purpose of this study is to examine the causes of delays in road construction projects in the Benin Republic from the consultant, client, and contractor perspectives. Design/Methodology/Approach. Through construction project reports, 20 factors that could cause delays in road construction projects were identified. The factors were arranged into a questionnaire, which was distributed to three separate experts. The fuzzy PIPRECIA (PIvot Pairwise RElative Criteria Relevance Assessment) method was used to calculate the independent importance of each delay factor. The Spearman and Pearson correlation coefficients were used to test the method’s consistency. Findings. The top five road construction project delays in the Benin Republic, according to the analysis of the 20 factors considered, are project funding, slowness during the client-endorsed payment process, scarcity of professional personnel, delay in indemnifying reimbursement (land-owners), and price escalation. This shows that of the various types of delays, the financial delay group is the most crucial. Originality/value. This study evaluates the causes of delays in road construction projects in the Benin Republic for the first time in literature. This study also examined the top 5 delay factors in road construction projects. This study is based on reports from road construction projects and a performed questionnaire survey. Based on the findings, measures have been formulated to aid project managers to alleviate the road construction delays in the Benin Republic. In addition, this study is practical for both scholars and road construction parties and provides a complete and verifiable analysis of the progress of a road construction project to make it easier and attain a competitive level of time, cost, and quality for successful road construction.
- СтавкаModels of Analysis of Credible Deviation from Speed Limits on Two-Lane Roads of Bosnia and Herzegovina(Wiley, 2022) Subotić, Marko; Stepanović, Nemanja; Tubić, Vladan; Softić, Edis; Bayane Bouraima, MouhamedAny deviation of speed in a traffic flow from a speed limit represents a potential risk of traffic accidents, so speed management appears as an imperative. However, an inadequately set speed limit often causes drivers’ noncompliance to it in the conditions of real traffic flow. By determining the value of exceeding the speed limit according to vehicle classes, it is possible to recommend a credible speeding value that can be considered credible up to a value above the speed limit. In this paper, deterministic multistep mathematical models of speed deviation from the speed limit as a function of longitudinal gradient for the proposed vehicle classes were developed. A total of 11 measuring sections with different traffic flow types were analyzed. Based on a detailed analysis of speeding, models for the deviation of the 15th, 50th, and 85th percentiles were obtained, with the aim of adjusting the credible deviation to control measures. -e results obtained in this study were compared with a survey of traffic flow speeding on two-lane roads conducted in Serbia.